When the City of Columbia, MO decided to replace deteriorating metal culverts on a busy road, they sought a bridge system solution that could be implemented quickly to reduce road closures. County Materials’ ArchCast Precast Bridge System proved to be ideal for its inherent strength and easy-to-install design that aligned with the project’s tight construction schedule. Within six weeks, seven 24’ by 10’ rise ArchCast units were manufactured, delivered, and installed.