Solutions: Oversized CMUs achieve significant time and cost savings, innovative concrete construction meets demands and accelerates construction schedule
As the student population at DeForest Area High School continued to grow, school district leaders saw the need for expansion to accommodate both current and future student populations. The school planned to build a new three-station gym and a pool with locker room facilities, spectator seating, and public access. With the completion of the additions, the former gym and pool area, along with several other areas of the building, would be renovated into two expansive commons areas for students to eat, study, and gather. In addition to providing students with more space, the 102,000 SF renovation and expansion project will allow students a university center-like experience with greater freedom and recreational space.