In response to increased congestion and deteriorating road conditions, the Wisconsin Department of Transportation completed a major overhaul of a 1.7-mile stretch of the WIS 100 corridor in Hales Corners, WI. New storm water infrastructure was required to control a large volume of runoff along the newly rebuilt highway. Reinforced concrete pipe was specified for its unmatched strength and durability. County Materials manufactured and delivered 22,270 LF of pipe and 411 precast structures for the project. Engineered and manufactured to optimize water flow, concrete pipe is a safe and reliable solution for storm water infrastructure.