As traffic in the St. Louis, MO area continued to increase and sections of both the nearby Meramec River Bridge and its adjacent corridor began to deteriorate, the Missouri Department of Transportation (MoDOT) set its sights on an expansive three-year reconstruction project that would improve the area’s traffic flow and reduce the risk of accidents. Before sections of the project could begin, a solution to mitigate flood risk during rain events needed to be implemented.
Tags:
Concrete Pipe & Precast